Norah Head Ocean Outfal

This project was built to send treated effluent into the sea from the Toukley Sewerage Treatment Works via a 2.4 kilometre tunnel driven by drill and blast method through hard rock out the ocean. The tunnel emerges below water level just below the Norah Head Lighthouse.
Nigel Pohio of BEM Group was contracted as Miner for this project.