Involved in Australia's landmark construction projects

triangle-up-orange
CURRENT
  • 2016 Whenan Shaft Refirbishment Project, Olympic Dam, SA

    MCA
    Contracted to MCA as In Shaft Project Manager on the Whenan Shaft Refirbishment Project at BHP Billiton’s Olympic Dam, SA.
  • 2016 North West Rail Link, Kellyville

    Kenny Constructions P/L
    Contracted to Kenny Constructions P/L supervising the construction of the elevated North West Rail Link from Bella Vista to Rouse Hill.
  • 2014 Eagle Downs Mine, Moranbah, Qld

    WDS
    Contracted the WDS to build 2 x 1:7 roadheader drifts.
  • 2013 Grosvenor Mine, Moranbah, Qld

    Trident Project & Mining Services
    Contracted to Trident Project & Mining Services to manage a shaft boring project.
  • 2012 Grasstree Mine, Middlemount, QLD

    Trident Project & Mining Services
    Contracted to Trident Project & Mining Services to manage a raise boring project.
  • 2012 Moranbah North Mine, Moranbah, QLD

    Trident Project & Mining Services
    Contracted to Trident Project & Mining Services to manage 2 x shaft boring projects.
  • 2011 Crinum North Mine, Emerald, QLD

    Trident Project & Mining Services
    Contracted to Trident Project & Mining Services to assist with grouting of the Pre-Driven Recovery Road for the Long Wall recovery.
  • 2010 Mt Lyell Mine, Queenstown, Tasmania

    Redpath Australia
    Contracted to REDPATH AUSTRALIA to assist with the set up, start up and running of their new sub-level caving operation. Nigel Pohio of BEM Group was contracted as General Superintendent for this project.
  • 2009 North South Bypass Tunnels/CLEM7

    Leighton Contractors and Baulderstone Bilfinger Berger Joint Venture
    This project was built as part of the Lord Mayor’s “TransApex” vision to get traffic flowing more freely around Brisbane. Consisting of 4.8 kilometre twin, 2-lane tunnels (or tubes), it provides a river crossing 60 metres under the Brisbane River, linking Brisbane’s growing northern and southern suburbs. Excavation of both 12.4 metre diameter tunnels was ... Read more
  • 2006 Warragamba Deep Storage Access Project

    Baulderstone Hornibrook
    Due to the drought at the time, this project was built to access water in the deepest part of the Warragamba Dam below the current intake port, resulting in immediate availability of an additional 170 billion litres of sustainable water storage. It involved removal of the 17 tonne concrete plug 70m below the water surface. ... Read more
  • 2005 Sydney Cross City Tunnels

    Baulderstone Hornibrook Bilfinger Berger (BHBB) Joint Venture
    Built to alleviate the cross city traffic that constantly congests the city of Sydney running from Rushcutters Bay in the east to Darling Harbour in the west. It runs beneath the streets and buildings of the Sydney Central Business District and included excavation with roadheaders and creation of main tunnels, ventilation tunnel, cross passages and ... Read more
  • 2002 Sydney M5 Tunnels

    Baulderstone Hornibrook Bilfinger Berger (BHBB) Joint Venture
    These 4 kilometre tunnels were constructed as part of the M5 East Motorway running from General Holmes Drive, Kyeemagh to King Georges Road, Beverly Hills. Nigel Pohio of BEM Group was contracted as General Superintendent (Tunnels) for this project.
  • 1999 Wombarra Drainage Project

    Transfield Tunnelling
    This project was built to alleviate flooding runoff from the escarpment during heavy downfalls and included a 30m horseshoe shaped shaft. Nigel Pohio of BEM Group was contracted as Shaft Foreman for this project.
  • 1999 Eastern Distributor

    Peabody Mining Services
    Anzac Parade & Moore Park Rd tunnels were exit ramps as part of the Eastern Distributor Project. Excavated with roadheaders, a part of these tunnels went through the Great Sydney Dyke. Nigel Pohio of BEM Group was contracted as Tunnel Superintendent for this part of the project.
  • 1998 Cannington Hoisting Shaft, Ventilation Shafts and Headframe

    Peabody Mining Services
    Cannington is the world’s largest single mine producer of silver and lead, representing about 6% of the world’s primary silver production, while its lead production represents about 7% of the world’s primary lead output. To extract approximately 1.8 million tonnes of ore to the surface annually, a 5.6 metre diameter hoisting shaft was constructed, extending ... Read more
  • 1996 Sydney M2 Tunnels

    Peabody Mining Services
    As part of the M2 Motorway running from East Ryde to Winston Hills, two tunnels were constructed concurrently using roadheaders. Nigel Pohio of BEM Group was contracted as Tunnel Superintendent for this project.
  • 1995 Prospect to Pipehead Water Tunnel

    Peabody Resources Ltd
    This tunnel was built to replace an existing open concrete canal that transferred water from Prospect Dam to the Water Treatment Plant at Pipehead, Guildford. Nigel Pohio of BEM Group was contracted as Superintendent for this project.
  • 1993 Hazelbrook Carrier III Tunnel

    Costain/Peabody Resources Ltd
    An extension of the Blue Mountains sewerage works to run untreated sewerage via a 9.5 kilometre tunnel from Hazelbrook to Faulconbridge then on to the Winmalee Sewerage Treatment Plant. Boreholes ranging in length from 60m to 350m were directionally drilled into the tunnel at various places to deliver sewerage to the system from intermediate surface ... Read more
  • 1992 Sydney Opera House Underground Carpark

    Thiess Contractors Pty Ltd
    This doughnut shaped carpark was built under the Botanical Gardens and Governors residence at the lower end of Macquarie St, Sydney, adjacent to the Opera House. Various tunnels were included in this project including the Bennelong drain diversion, air intake and exhaust tunnels, pedestrian walkways and vehicle entry/exit tunnels. Nigel Pohio of BEM Group was ... Read more
  • 1990 Boomerang Creek Tunnel

    Coya Constructions Pty Ltd
    Construction of an 11 kilometre long tunnel to supply water from Mangrove Creek Dam (Gosford Shire) to Yarramalong Valley (Wyong Shire). Once water reached the Yarramalong Valley, it would flow on down to the Mardi Dam for storage. Nigel Pohio of BEM Group was contracted as Shiftboss for this project.
  • 1987 Blackall Range Tunnel

    J E Gardner Pty Ltd
    A 2.4 kilometre tunnel to house a water supply pipeline from Baroon Pocket Dam through to Palmwoods. Excavated by drill and blast method. Nigel Pohio of BEM Group was contracted as Shiftboss for this project.
  • 1986 Ski Tube

    J E Gardner Pty Ltd
    This project was the extension of the Ski Tube from Perisher to Blue Cow, excavated by drill and blast. A TBM excavated the initial tunnel from Bullocks Flat to Perisher. Nigel Pohio of BEM Group was contracted as Miner/Operator for this project.
  • 1986 Norah Head Ocean Outfal

    Jaspin Pty Ltd
    This project was built to send treated effluent into the sea from the Toukley Sewerage Treatment Works via a 2.4 kilometre tunnel driven by drill and blast method through hard rock out the ocean. The tunnel emerges below water level just below the Norah Head Lighthouse. Nigel Pohio of BEM Group was contracted as Miner ... Read more
  • 1985 Pit Drainage Tunnel, Panguna, Papua New Guinea

    Downer and Company Ltd
    7 kilometre pit drainage tunnel construction and lining. Nigel Pohio of BEM Group was contracted as Shiftboss for this project.
  • 1984 Power Project III, Monasavu, Fiji

    Kier - Downer Joint Venture
    Construction of 3 kilometre’s of concrete lining of the Nambilabila tunnel using the highly successful telescopic arch form. Nigel Pohio of BEM Group was contracted as Shiftboss for this project.
  • 1984 Ok Tedi Tunnels, Papua New Guinea

    Kier International Ltd
    Nigel Pohio of BEM Group was contracted as Shiftboss on all three tunnels of this project, including the Ok Mani, Moscow Ridge and the Ok Ma tunnels. The Ok Ma tunnel was later abandoned due to the Ok Ma land slide.
PAST